Milan Metro Tunnel - Milan, Italy
- built under the Italy's second largest city and capital of the North
- in Sept. 2005, the Milan metro system is 74.1 km long (51.5 km underground) and has 87 stations (74 underground)
- the "red line" interconnect the city from North-East side to West side, where braches out in two directions: towards North-West and South-West
- the "red line" is the first line of Milan subway
- first stretch built in 1964 by CommsCon Italia
- most recent tracts in 2005:
- 8th lot: North-West branch (Molino Dorino)
- 9th lot: South-West branch (Primaticcio)
Coverage requirement
- Number of systems/bands: GSM1800, UMTS2100
- Number of operators per band:
- GSM1800: 3 operators
- UMTS2100: 4 operators
- Maximum capacity per operator: one BTS per band per operator
- GSM1800: 4+4+4 per BTS
- UMTS2100: 1+1+1+1 TRX per BTS
- Number of sectors:
- 8th lot: 3 sectors
- 9th lot: 2 sectors
- Signal criteria:
- GSM1800: -85dBm
- UMTS2100:
- -85dBm in stations
- -90dBm in tunnels inside the train
Teko Telecom Solution
- High Power RUs: 25 for 8th lot and 11 for 9th lot
- Cascade configuration:
- 2 wavelengths for 8th lot and 3 wavelengths for 9th lot
- e.g. 1 RU located in the metro station and 1 RU installed in the tunnel
- Simplified custom POI allowing costs saving, high compactness and customized interface with BTS/Node-B
- Uplink Diversity for UMTS signals